• News
  • ERP System
  • Options
  • Services
  • References
  • Contact
  • Support
  • Career
  • CLOUD
  • Linked In
  • Vimeo
  • Splashtop
  • Sverige Sverige
  • Suomi Suomi
  • Danmark Danmark
  • Polska Polska
  • Asia Asia
  • 中文 中文
  • Deutsch Deutsch
  • Norge Norge
  • Sverige Sverige
  • Suomi Suomi
  • Danmark Danmark
  • Polska Polska
  • Asia Asia
  • 中文 中文
  • Deutsch Deutsch
  • Norge Norge
  • Linked In
  • Vimeo
  • Splashtop
  • News
  • Support
  • Career
  • ERP System
  • Options
  • Services
  • References
  • Contact
  • CLOUD
  • See all
  • New Features in G5, version 22.2

    Here's a summary of the major new features in MONITOR G5 for version 22.2, broken down by our teams that specialize in developing each area of the system. We hope you'll find this useful and interesting. For more detailed information on new development, you can visit the Changelog for each version.


    MANUFACTURING-TIME RECORDING

    During this sprint we’ve been able to close a lot of development to be included in the new version.

    What's new?

    Report more than planned quantity for serial numbers

    On a manufacturing order, we can now report more than the planned quantity for a material with the traceability level Serial number. This is useful when you need to report one or more parts as rejected.

    Report traceability in Mobile-client

    Other long-awaited development is that we now have support for reporting manufacturing orders with traceability in the mobile client.

    CDT-development

    The CDT calculation now has much better support for work centers with pool planning. In addition to better results, we can also see a major performance improvement for BOM and routing where a pool work center is used on one of the operations.

    Suggest remaining quantity on material rows

    There is a new system setting that determines if automatic reporting of material on manufacturing orders should be restricted, so as not to report more than the planned quantity. This makes it possible to avoid reporting double quantities when pick lists and automatic reporting is combined.

    New manual operation status

    A new manual status on manufacturing order operations is now available. This can be used for tool status, program status, etc. The value is added in priority planning, and is visible in the Recording terminal.

    New lead time chart

    The lead time chart in the manufacturing module has been updated. It now resembles the one used for Projects. We've also added a toggle button in the toolbar that enables you to replan either the single operation or the entire order.

    Issues resolved

    The team has resolved 56 issues, of which 38 were reported by customers. These include:

    • CDT: The result was incorrect when suggestions for loading were included.
    • Loading plan: Scrolling by week generated the wrong result for Pool work centers.
    • Register manufacturing order: The result was incorrect for alternative preparation using part status.

    Looking ahead

    In the next sprint, we'll keep working with support for recording Location in the recording terminal. And in BOM and routing, we're developing support for a density register and will continue to work with improvements for the Mobile Recording terminal.

     

    STOCK

    Our developers have been working very hard, and we've managed to close a lot of development features. You'll be able to enjoy many new useful functions in version 22.2!

    Our main focus ahead of this release is shown here:

    Case “MONITOR-to-MONITOR”

    It took some time to resolve this functionality in the system, while ensuring it would work with G4. You can now send cases from one MONITOR system to another. It's also possible to use the ‘Import desk component’ with a case, and there will be a dialogue for the incoming values to be validated before import.

    Serial number/batch – Replace serial number or batch

    Some of our customers have a major need to make changes in the traceability tree. If a serial number or batch is replaced in the system that has been delivered, the traceability tree also needs to be updated accordingly.

    We have been working hard on a process to enable this, and the solution is to use the “manual level list”, with some additional columns.

    Stock analysis – Turnover ratio

    The final piece of the puzzle (for now at least) is the turnover ratio analysis. The calculation is pretty much the same as in G4, and we've added the fields in the part register to save the turnover ratio for each part.

    Stock value – changed names in lists

    The list called "Standard" has now been changed to “Detailed by location”, and the list called “Detailed” has now changed to "Standard". This is to do with an issue that is caused by the Stock transaction log and locations (a well-known G4 issue, with renamed locations). 

    Upcoming development

    • Release of the updated version of “Move stock balance – desktop”.
    • New procedure for “Price development”.
    • Inactivate part (hide) from all procedures.
    • Replace traceability in Manufacturing order.
    • Activity list – Agent support.


    SALES-PURCHASE-EDI

    During this sprint we’ve been focusing mainly on two ongoing projects, Customer agreement and Customer order transfer (COT), with configuration.

    And we're happy to announce we've reached our goal to release Customer agreements in version 22.2. We're also still working on adding additional functionality for the customer agreement procedures.

    What's new?

    Customer agreements

    In the Sales module, we've now released Customer agreements, which can be found under the Agreements box (see above).

    This procedure allows you to register customer agreements and invoice your customers based on a given invoicing interval.

    To learn more about some of the features within customer agreements – and how to use them in your day-to-day activities – watch our New Features in G5 video by following this link.

    Only show modified rows on Modified purchase order document

    On the Modified purchase order document it is now possible to select only to show the modified purchase order rows. This setting will hide all rows that have not been subject to change.

    MONITOR-to-MONITOR: Handle transport time similar to MONITOR G4

    When importing order responses or customer orders via MONITOR-to-MONITOR in MONITOR G5, we now handle the transport time in a similar way to MONITOR G4. Before this change, there could be differences between the delivery date in sender’s system and the system carrying out the import.

    Adjustments in the Sales module delivery flow

    In order to make the delivery process more seamless for the user, we've made some adjustments relating to the following procedures:

    Delivery planning

    Using the list type Picking in progress, it is now possible to create a shipment, including the selected pick lists. Relating to this, we've made some UI adjustments and are now using an Include column combined with action buttons in the grid toolbar. In addition, the Reprint tab is now always active.

    Pack for delivery

    We're now using alternating row colors in the Package structure grid, and in the Document tab, all transport labels are now selected by default. We also have a new function making it possible to include selected packages into a new packaging part in an simple way.

    Register shipment

    It's now possible to edit the Shipping agent's shipment no. field, if the plugin is Other. It's also possible to trigger EDI export of a complex dispatch advice.

    Issues resolved

    The team has resolved 55 issues, of which 36 were reported by customers.

    Looking ahead

    We will retain our focus on COT with configuration.

    Beside this, we'll also be working on the following:

    Additional functionality for customer agreements

    • Modified agreement report – A new document that will show changes made on agreements.
    • Document structure tab.
    • Added support for conversion from MONITOR G4 to MONITOR G5.
    • The ability to modify Planned invoice date.

    Variable receiving inspection

     

    FINANCE

    What's new?

    In total we've closed 50 development items during the sprint, which are a mix of country specific developments as well as standard functionality. Below you can read a summary of some of the development carried out in this version.

    Percentage-of-completion method in Project register

    The percentage-of-completion method (PCM) for projects has now been implemented for MONITOR G5. The percentage-of-completion method is used to handle work in progress at year-end closing. This means income is registered as services are being performed and material is consumed, while income is accrued and costs recognized as expenses when resources are consumed. 

    For more detail about this method, visit the Changelog for version 22.2.

    Accrual accounting and handling of suspended VAT concerning invoices from Customer agreement

    Customer agreement is a new area of development in this version.

    The Finance team has developed the area concerning accrual accounting from invoices created from agreements. Only agreements with the invoicing method “In advance” can be marked with accrual accounting. When the agreement is marked with accrual accounting, an accrual accounting post will automatically be created when the invoice is approved.

    Load invoice address from customer register concerning statements/reminders

    A new setting has been added to the documents Payment reminder, Statement, and Statement balance/customer, in the Sales tab in the procedure's document setting. This setting determines if the invoice address will be loaded from an invoice or the customer register.

    Separate number series for Advance invoices

    We've now added the capability to print advance invoices with a separate invoice number series. This can be configured under the sales tab, in the Number series procedure.

    Ability to update VAT code in the Voucher list

    This has been a highly requested area of development from companies loading data to VAT reports via the VAT code in General ledger transactions. With this system setting, it's now possible to update VAT code in the voucher list.

    Issues resolved and performance improvements

    During this sprint, we've resolved 87 issues, of which 49 are linked to support cases.

    Looking ahead

    During the next sprint we´ll be focusing on the following development:

    • Altinn integration – Norway.
    • VAT changes – Poland.
    • GOBD export – Germany.
    • Invoicing plan from Quotation.
    • Accrual accounting via Authorize supplier invoice.
    • Currency types on customer/supplier level.
    • EIM Workflow – improvements to matching functionality.
    • Residual value deprecation.



    WEB-TECHNOLOGY

    One of our focus areas in this sprint has been printing improvements, and the new printing dialog for manufacturing orders.

    We've also continued work on adding support for Microsoft SQL Server. In version 22.2, it will also be possible to add user-defined languages (non-ISO). Other important work to highlight is our new backup solution.

    And, as usual, we've carried out a lot of smaller improvements and fixes.

    What's new?

    New printing dialog

    The new dialog will allow the user to control the printout order of linked files, and provides the ability to change settings such as number of copies, orientation, color, duplex and paper size. It also comes with a new look and improved performance.

    In version 22.2, we have implemented the new printer dialog in Print manufacturing order, and we'll be gradually adding this to Priority Planning and Register manufacturing order in the weeks ahead. A setting for activating the new dialog can be found in MONITOR's Backstage.

    Backup

    The new solution offers easier and more user-friendly setups of backup jobs, by handling everything in Installation Manager, while using Microsoft task-scheduler as scheduler.

    E-mail notification can be customized for each job itself, or in general.

    This will be rolled out to our customers in different stages, and is not tied to the release of version 22.2.

    Microsoft SQL Server

    There are multiple ongoing customer projects in which we are helping customers to go live for the first time, as well as helping customers currently using SQL Anywhere to move up to MSSQL. Alongside this, we will also continue to develop new functionality to enable easier transfer to the new SQL solution.

    Issues resolved and performance improvements

    • A new type of date picker is now available for customers experiencing freezes when using the regular picker. Activate the new one in backstage.
    • A problem with highlighting work centers in the Loading plan has been resolved.
    • An issue has been resolved when creating serial numbers that took a long time in Direct stock reporting, while the Serial number/Batch procedure was opened.
    • A lot of improvements have been made involving pickers in different procedures.
    • A problem with the filtering-function that stopped working in Incoming payments has been resolved.
    • And many more…

    Looking ahead

    We'll continue our work on MSSQL, implementing the new printing dialog into more procedures and starting the work on our business adaptation plugin functionality – or BAP for short.

    BAP will allow users to have plugins running directly in different procedures. These plugins will be created by our Adaptation department.

     

     

     

    The Company

    Our Business Concept

    About Us

    Working for Monitor

    Available Positions

    More of MONITOR

    Upgrade to G5

    Monitor Academy

    Book a Consultant

    Purchase Options

    Partners

    Read More

    Media

    GDPR

    System Recommendations

    Quality management

    Cookies

    Contact Information

    Monitor ERP System AB

    Trädgårdsgatan 7
    Box 264 • 824 26 Hudiksvall

    +46 650 766 00

    [email protected]